高速公路填方路基预制梁场变形控制措施研究
DOI:
作者:
作者单位:

1.中交第二公路工程局有限公司;2.西安建筑科技大学土木工程学院

作者简介:

通讯作者:

中图分类号:

TU472

基金项目:

国家自然科学基金项目(面上项目,重点项目,重大项目)


Study on Defor mation Control Measures for Prefabricated Beam Yard on High Embankment Highway
Author:
Affiliation:

1.China Communications Second Highway Engineering Bureau Co,Ltd,Shaanxi Xi'2.'3.an;4.School of Civil Engineering,Xi'5.an University of Architecture and Technology,Shaanxi Xi'

Fund Project:

The National Natural Science Foundation of China (General Program, Key Program, Major Research Plan)

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    由于山岭地区的地形限制,高填方边坡和桥梁等交通形式屡见不鲜,加之地形的限制导致桥梁结构预制构件运输困难,在高填方路基之上布置预制梁场能够解决山区地形限制以及桥梁预制构件运输困难等问题。因此本文针对高填方路基布置下沉式预制梁场的问题,分析填方路基沉降变形的主要因素,应用多种变形控制措施以控制高填方路基及预制梁场的变形,通过三维数值模型分析填方路基及梁场变形特点。研究表明:换填物理性质较差的下层土体、采用物理物理性质较好的填料层能够有效减小预制梁场的不均匀沉降;采用沉降控制措施后,预制梁场的整体沉降在20 mm作用,但不均匀沉降仅为3 mm;预制梁场施工期对下层填料的影响范围与梁场面积相似。

    Abstract:

    Due to the topographic limitation in the mountainous area, the traffic forms such as high fill slope and bridge are not uncommon, and the limitation of the terrain leads to the difficulty of transporting the prefabricated components of the bridge structure, and the prefabricated beam yard can be arranged on the high fill roadbed to solve the problems of mountainous terrain restriction and the transportation difficulty of the prefabricated components of the bridge. Therefore, in order to solve the problem of the layout of the sunken precast beam field of the high-fill subgrade, this paper analyzes the main factors of the settlement and deformation of the fill subgrade, applies a variety of deformation control measures to control the deformation of the high-fill subgrade and the precast beam field, and analyzes the deformation characteristics of the fill subgrade and the beam field through a three-dimensional numerical model. The results show that the uneven settlement of the precast beam field can be effectively reduced by replacing the lower layer of soil with poor physical properties and using the filler layer with better physical properties. After the settlement control measures were adopted, the overall settlement of the precast beam yard was 20 mm, but the uneven settlement was only 3 mm. The influence range of the precast beam yard on the lower filler during the construction period is similar to that of the beam yard area.

    参考文献
    相似文献
    引证文献
引用本文
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-07-31
  • 最后修改日期:2024-10-23
  • 录用日期:2024-11-22
  • 在线发布日期:
  • 出版日期:
文章二维码
网站二维码
期刊公众号