欢迎访问《中外公路》官方网站,今天是
分享到:
紧邻既有车站和钢便桥的超大异形基坑施工方案优化
CSTR:
作者:
作者单位:

(中铁南方投资集团有限公司 ,广东 深圳 518060)

作者简介:

陈登伟,男,硕士,高级工程师.E-mail:dengweichencrsig@163.com

通讯作者:

中图分类号:

U416

基金项目:

国家自然科学基金资助项目(编号:52008263);中国中铁股份公司科技研究开发计划课题(编号:2020-重点-14);中铁南方2020科技研发计划项目(编号:4403012022004346)


Optimization of Construction Scheme of Ultra‑Large Special‑Shaped Foundation Pit Adjacent to Existing Station and Temporary Steel Bridge
Author:
Affiliation:

(China Railway Southern Investment Group Co ., Ltd., Shenzhen , Guangdong 518060 , China )

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    随着中国城市地下空间开发密度不断增加,超大基坑施工对紧邻结构正常运营的影响不容忽视。该文依托深圳黄木岗综合交通枢纽工程,研究了超大异形基坑开挖引起围护结构和土体变形,以及紧邻既有车站变形和钢便桥的结构响应,并对该异形基坑开挖施工方案进行优化。结果表明:基坑南北侧围护结构的变形趋势整体一致,但北侧阳角处变形量较大;既有车站围护结构整体发生向坑内位移,最大水平位移达 9.4 mm;基坑开挖后钢箱梁桥桩的水平位移较大,最大值达到 10.5 mm。通过在负一层加设临时混凝土支撑和坑内钢便桥桥墩上增设钢套筒,保证了整体施工安全。

    Abstract:

    With the intensifying development density of urban underground space in China,the impact of ultra-large foundation pit construction on the normal operation of adjacent structures cannot be ignored.Relying on the Huangmugang Comprehensive Transportation Hub Project in Shenzhen,this paper studied the deformation of the envelope structure and soil caused by the excavation of the ultra-large special-shaped foundation pit,as well as the structural response of the deformation of the adjacent existing station and the temporary steel bridge.The paper optimized the construction scheme of the special-shaped foundation pit excavation.The results show that the deformation trend of the envelope structure on the north and south sides of the foundation pit is the same as a whole,but the deformation at the external corner on the north side is large.The envelope structure of the existing station as a whole is displaced into the pit,with a maximum horizontal displacement of 9.4 mm,and the horizontal displacement of the steel box girder bridge pile after excavation of the foundation pit is large,with the maximum value reaching 10.5 mm.The overall construction safety is ensured by adding temporary concrete supports on the lower ground and adding steel sleeves on the piers of the temporary steel bridge in the pit.

    参考文献
    相似文献
    引证文献
引用本文

陈登伟.紧邻既有车站和钢便桥的超大异形基坑施工方案优化[J].中外公路,2024,44(6):11-19.
CHEN Dengwei. Optimization of Construction Scheme of Ultra‑Large Special‑Shaped Foundation Pit Adjacent to Existing Station and Temporary Steel Bridge[J]. Journal of China and Foreign Highway,2024,44(6):11-19.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-10-23
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-12-17
  • 出版日期:
文章二维码
网站二维码
期刊公众号