隧道施工期间不同通风方式的对比研究
作者:
作者单位:

(1.广东长正建设有限公司 ,广东 珠海 519000;2.深圳大学 交通与土木工程学院 ,广东 深圳 518061;3.深圳大学 滨海城市韧性基础设施教育部重点实验室 ,广东 深圳 518061;4.上海隧道工程有限公司 ,上海市 200032)

作者简介:

岳昆,男,大学本科,工程师.E-mail:2987927698@qq.com

通讯作者:

吴涵,女,硕士研究生.E-mail:1195190141@qq.com

中图分类号:

U455

基金项目:

国家重点研发计划项目(编号:2019YFC1511104);国家自然科学基金资助项目(编号:52022060);深圳市科技创新计划项目(编号:JCYJ20190808112203700)


Comparative Study of Different Ventilation Methods during Tunnel Construction
Author:
Affiliation:

(1.Guangdong Changzheng Construction Co ., Ltd., Zhuhai, Guangdong 519000, China; 2.College of Civil and Transportation Engineering , Shenzhen University , Shenzhen , Guangdong 518061, China; 3.Key Laboratory of Coastal Urban Resilient Infrastructures (Shenzhen University ), Ministry of Education , Shenzhen , Guangdong 518061, China; 4.Shanghai Tunnel Engineering Co ., Ltd., Shanghai 200032, China)

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    随着隧道施工技术水平的不断提升,隧道掘进的速度和里程快速增长,其中隧道施工期间的通风问题是影响隧道高效、安全施工的主要问题之一。该文以珠海兴业快线 (西线)隧道工程为背景,研究压入式、抽出式和混合式 3种通风方式对隧道工作面附近有害气体 CO的稀释情况、排出效果和洞内风速的影响。结果表明:混合式通风在 CO稀释方面更有优势,而抽出式通风的 CO排出效率较高,其工作面附近的风速较小。因此,虽然压入式通风在 CO的稀释和排出效率方面稍弱,但在考虑工作面附近保持一定风量的情况下,应该在隧道施工中考虑采用压入式通风方式。

    Abstract:

    The continuous improvement of tunnel construction technology brings a rapid increase in the speed and mileage of tunnel excavation,during which ventilation is a main problem affecting construction efficiency and safety.Taking the Zhuhai Xingye Express (West Line ) tunnel project as an example,this paper studied the influences of forced ventilation,exhaust ventilation,and hybrid ventilation on the dilution and discharge of harmful gas CO near the tunnel face and the wind speed in the tunnel.The results show that hybrid ventilation performs better in CO dilution,while exhaust ventilation has higher CO emission efficiency with a lower wind speed near the working face.Therefore,although forced ventilation is slightly weaker in terms of CO dilution and discharge efficiency,it is still demanded in tunnel construction when maintaining a certain air volume near the working face is considered.

    参考文献
    相似文献
    引证文献
引用本文

岳昆,包小华,敖翔,等.隧道施工期间不同通风方式的对比研究[J].中外公路,2024,44(5):218-224.
YUE Kun, BAO Xiaohua, AO Xiang, et al. Comparative Study of Different Ventilation Methods during Tunnel Construction[J]. Journal of China and Foreign Highway,2024,44(5):218-224.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2024-09-10
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-10-28
  • 出版日期:
文章二维码
网站二维码
期刊公众号