基于交通冲突的城市地下互通左出匝道减速车道长度研究
作者:
作者单位:

(1.武汉城市铁路建设投资开发有限责任公司 ,湖北 武汉 430061 ;2.中交第二公路勘察设计研究院有限公司 ,湖北 武汉 430056 ;3.武汉工程大学 土木工程与建筑学院 ,湖北 武汉 430074 ;4.武汉理工大学 智能交通系统研究中心 ,湖北 武汉 430063 )

作者简介:

王海亮,男,硕士,高级工程师.E-mail:69474415@qq.com

通讯作者:

丁乃侃,男,博士,副研究员.E-mail:nkding@whut.edu.cn

中图分类号:

U491.5

基金项目:

国家自然科学基金资助项目(编号:71901166)


Study on Length of Deceleration Lane of Left Off‑Ramp for Urban Underground Interchanges Based on Traffic Conflicts
Author:
Affiliation:

(1.Wuhan Urban Railway Construction Investment & Development Co ., Ltd.,Wuhan 430061 ,China ;2.Second Highway Consultant Company Ltd .,CCCC ,Wuhan 430056 ,China ;3.School of Civil Engineering and Architecture , Wuhan Institute of Technology , Wuhan , Hubei 430074 , China ;4.Intelligent Transportation Systems Research Center , Wuhan University of Technology , Wuhan , Hubei 430063 , China )

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为了确定城市地下互通左出匝道分 流区减速车道长度的合理区间,研究减速车道长度与主线、匝道的交通量和设计速度的交互作用对左出分流区交通冲突的影响,该文以武汉市两湖隧道工程地下互通立交为例,开展 VISSIM 微观交通仿真试验,并提取冲突率 (RCR)和碰撞暴露时间 (TTET)指标进行分析。结果显示:① 随着减速车道长度增加,分流区冲突率减小而 TTET增大;② 随着主线交通量或匝道交通量的增大,分流区冲突率未呈现显著变化,而TTET有不同程度的增大;③ 随着主线设计速度的增大或匝道设计速度的减小,分流区冲突率和 TTET均呈现增大的趋势;④ 方差分析和多重比较表明,减速车道长度是引起冲突率和 TTET变化的关键原因,且综合来看地下互通立交左出匝道分流区减速车道长度的一般合理区间应设置为 120~170 m,考虑工程经济性最大长度宜控制在 195 m以内。

    Abstract:

    To set a reasonable range of the length of the deceleration lane in the diverge area of the left off-ramp for urban underground interchanges,the effects of the length of the deceleration lane,as well as interactions between traffic volumes and design speeds of mainline and ramp on traffic conflict in the diverge area,were exami ned.By taking the underground interchange of the Wuhan East-South Lakes Tunnel Project as an example,the VISSIM micro traffic simulation test was carried out,and the conflict rate (RCR) and exposed time to collision (TTET) were extracted.The results show that ① when the length of the deceleration lane increases,the conflict rate decreases,and the TTET increases in the diverge area;② when the traffic volumes of the mainline or ramp increase,no significant changes were observed in the conflict rate of the diverge area,while the TTET increases to varying degrees;③ when the design speed of the mainline increases,or the design speed of the ramp reduces,both the conflict rate and the TTET of the diverge area increase;④ Analysis of variance and multiple comparisons indicate that the length of the deceleration lane plays a critical role in the variations of conflict rate and TTET,and 120~170 m is generally recommended to be a reasonable length of the deceleration lane in the diverge area of the left off-ramp for underground interchanges.The maximum length should be controlled within 195 m considering the economic value of the project.

    参考文献
    相似文献
    引证文献
引用本文

王海亮,程冲,官洪,等.基于交通冲突的城市地下互通左出匝道减速车道长度研究[J].中外公路,2024,44(1):209-217.
WANG Hailiang, CHENG Chong, GUAN Hong, et al. Study on Length of Deceleration Lane of Left Off‑Ramp for Urban Underground Interchanges Based on Traffic Conflicts[J]. Journal of China and Foreign Highway,2024,44(1):209-217.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2023-05-31
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2024-03-18
  • 出版日期:
文章二维码
网站二维码
期刊公众号