欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Influence of Blasting Point Position and Foundation Pit Height on Blasting Vibration during Foundation Pit Blasting Excavation
Author:
Affiliation:

(1. Shanghai Tunnel Engineering Co ., Ltd, Shanghai 200232 , China ; 2. College of Civil and Transportation Engineering , Shenzhen University , Shenzhen , Guangdong 518060 , China ;3. Guangdong Changzheng Construction Co ., Ltd., Zhuhai , Guangdong 519000 , China )

Clc Number:

U455.6

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In view of inaccurate vibration prediction of foundation pit blasting,the influence of blasting point position and foundation pit height on vibration during foundation pit blasting excavation was studied by using finite element simulation software.First,based on the foundation pit blasting excavation of the Mawan Cross-Sea Passage,a numerical simulation was carried out to verify the applicability of the model.Then,under unchanged blasting center distance,the distance from the blasting point to the edge of the foundation pit and the foundation pit height were changed respectively,and the influence of these two factors on surface vibration was studied.The results show that a greater distance from the blasting point to the edge of the foundation pit indicates a smaller vibration velocity of the corresponding distance measuring point.As the height of the foundation pit increases,the vibration velocity of the corresponding distance measuring point gets larger.The influence of foundation pit height on surface vibration velocity is greater than that of blasting point position.The research results can provide some reference for the vibration prediction of foundation pit blasting and have practical engineering significance.

    Reference
    Related
    Cited by
Get Citation

刘宽,徐志豪,汤渊,等.基坑爆破开挖爆点位置与基坑高度对爆破振动影响研究[J]. Journal of China and Foreign Highway,2024,44(2):214-219.
LIU Kuan, XU Zhihao, TANG Yuan, et al. Influence of Blasting Point Position and Foundation Pit Height on Blasting Vibration during Foundation Pit Blasting Excavation[J]. Journal of China and Foreign Highway,2024,44(2):214-219.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:October 15,2022
  • Revised:
  • Adopted:
  • Online: May 07,2024
  • Published:
Mobile website
WeChat