欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Study on Treatment Method of Expansive Soil Embankment in Expressway Reconstruction and Extension
Author:
Affiliation:

(1.Anhui Transportation Holding Group Co ., Ltd., Hefei , Anhui 230088 , China ;2.Anhui Transport Consulting & Design Institute Co ., Ltd., Hefei , Anhui 230088 , China ;3.School of Traffic and Transportation Engineering , Changsha University of Science & Technology , Changsha , Hunan 410114 , China )

Clc Number:

U416.1

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to fully utilize expansive soil as filler in highway reconstruction and expansion projects,this paper draws on the successful experience of using expansive soil directly in road construction.It proposes an embankment treatment scheme that involves the use of geogrid-reinforced expansive soil with edge wrapping,based on the reconstruction and expansion project of the Hefei to Dagudian section of the G 40 Shanghai-Shaanxi Expressway.Through laboratory tests,the road performance and swelling characteristics of the expansive soil filler were investigated to determine the applicable scope and compaction control indices of the filler.Then,the feasibility of the embankment treatment scheme was demonstrated through the prediction of the embankment swelling,stability analysis of geogrid-reinforced slopes,and economic effect analysis.The results show that the total swelling-shrinkage ratio of the filler is 1.12%,and its RCBR is greater than 3%,preliminarily verifying the feasibility of using physically treated expansive soil filler,such as edge wrapping and reinforcement,as lower embankment material.If the compaction control index determined by the wet compaction test is used,the estimated value of the embankment swelling will be an order of magnitude smaller than that determined by the dry compaction method.The anti-pullout safety factors of the geogrids at each layer meet the standard requirements of not less than 2.0,avoiding the risk of pullout.Compared to the lime improvement scheme,this scheme can significantly shorten the construction period and reduce costs.

    Reference
    Related
    Cited by
Get Citation

王雨威,胡艳丽,张锐.高速公路改扩建膨胀土路堤处置方法研究[J]. Journal of China and Foreign Highway,2024,44(1):1-8.
WANG Yuwei, HU Yanli, ZHANG Rui. Study on Treatment Method of Expansive Soil Embankment in Expressway Reconstruction and Extension[J]. Journal of China and Foreign Highway,2024,44(1):1-8.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:May 04,2023
  • Revised:
  • Adopted:
  • Online: March 18,2024
  • Published:
Mobile website
WeChat