U445.4
张宏武,柯红军,陈卓异,等.不调整临时墩顶标高的双向纵坡竖曲线梁顶推方案研究及实施[J]. Journal of China and Foreign Highway,2023,43(4):118-123.
ZHANG Hongwu, KE Hongjun, CHEN Zhuoyi, et al. Study and implementation of jacking scheme of vertical curve beam with two ‑way longitudinal slope without adjusting temporary pier top elevation[J]. Journal of China and Foreign Highway,2023,43(4):118-123.