欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Analysis of installation method and error control of steel girder of steel ⁃concrete composite girder cable ⁃stayed bridge
Author:
Affiliation:

Clc Number:

U445.4;U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

熊先勇,傅亚军,黄茛.钢‒混组合梁斜拉桥钢主梁安装方法分析与误差控制[J]. Journal of China and Foreign Highway,2023,43(3):126-133.
XIONG Xianyong, FU Yajun, HUANG Gen. Analysis of installation method and error control of steel girder of steel ⁃concrete composite girder cable ⁃stayed bridge[J]. Journal of China and Foreign Highway,2023,43(3):126-133.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 04,2022
  • Revised:
  • Adopted:
  • Online: July 14,2023
  • Published:
Mobile website
WeChat