欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Calculation of arch rib installation alignment of large span cable hoisting arch bridge
Author:
Affiliation:

Clc Number:

U448.22

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

熊邵辉,郭鑫,游佐巧.大跨度缆索吊装拱桥拱肋安装线形计算[J]. Journal of China and Foreign Highway,2023,43(3):109-113.
XIONG Shaohui, GUO Xin, YOU Zuoqiao. Calculation of arch rib installation alignment of large span cable hoisting arch bridge[J]. Journal of China and Foreign Highway,2023,43(3):109-113.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 06,2021
  • Revised:
  • Adopted:
  • Online: July 14,2023
  • Published:
Mobile website
WeChat