欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Analysis and optimal adjustment of manufacturing errors of main girder of long ⁃span steel box cable ⁃stayed bridge
Author:
Affiliation:

Clc Number:

U448.27

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

涂光亚,周郅哲.大跨度钢箱梁斜拉桥主梁制造误差分析与优化调整[J]. Journal of China and Foreign Highway,2023,43(3):88-92.
TU Guangya, ZHOU Zhizhe. Analysis and optimal adjustment of manufacturing errors of main girder of long ⁃span steel box cable ⁃stayed bridge[J]. Journal of China and Foreign Highway,2023,43(3):88-92.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:June 01,2021
  • Revised:
  • Adopted:
  • Online: July 14,2023
  • Published:
Mobile website
WeChat