欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Optimization Analysis of Assembly Process of Rapid Construction Composite Continuous Rigid Frame Bridge with Steel Truss-Concrete Girders
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

吴昊,高燕梅,周志祥.快速施工钢桁-混凝土组合连续刚构桥装配工序优化分析[J]. Journal of China and Foreign Highway,2020,40(6):92-97.
WU Hao, GAO Yanmei, ZHOU Zhixiang. Optimization Analysis of Assembly Process of Rapid Construction Composite Continuous Rigid Frame Bridge with Steel Truss-Concrete Girders[J]. Journal of China and Foreign Highway,2020,40(6):92-97.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:April 20,2020
  • Revised:
  • Adopted:
  • Online: July 04,2023
  • Published:
Mobile website
WeChat