蒋庆,徐嵩基,李涛,等.钢绞线张拉后48 h内锚下预应力随时间衰减效应研究[J]. Journal of China and Foreign Highway,2020,40(4):105-109.
JIANG Qing, XU Songji, LI Tao, et al. Study on Time-Varing Attenuation Effect of Anchor Prestress within 48 Hours after Tensioning of Steel Strands[J]. Journal of China and Foreign Highway,2020,40(4):105-109.