欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Construction Process Analysis of Arch Main Tower of Cable-Stayed Bridge and Optimization of Prestress Tensioning Process of Lower Crossgirder
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

杨智文,来晓理,黄飞鸿,等.斜拉桥拱形主塔施工过程分析与下横梁预应力张拉工序优化[J]. Journal of China and Foreign Highway,2020,40(2):78-81.
YANG Zhiwen, LAI Xiaoli, HUANG Feihong, et al. Construction Process Analysis of Arch Main Tower of Cable-Stayed Bridge and Optimization of Prestress Tensioning Process of Lower Crossgirder[J]. Journal of China and Foreign Highway,2020,40(2):78-81.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 12,2019
  • Revised:
  • Adopted:
  • Online: June 28,2023
  • Published:
Mobile website
WeChat