欢迎访问《Journal of China and Foreign Highway》官方网站,今天是
分享到:
Numerical Simulation and Monitoring Measurement of Rapid Construction Method with Three-Bench and Five-Step in Large Cross-Section Tunnel
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Reference
    Related
    Cited by
Get Citation

杨志强.大断面隧道中三台阶五步法的数值模拟分析[J]. Journal of China and Foreign Highway,2020,40(1):191-195.
YANG Zhiqiang. Numerical Simulation and Monitoring Measurement of Rapid Construction Method with Three-Bench and Five-Step in Large Cross-Section Tunnel[J]. Journal of China and Foreign Highway,2020,40(1):191-195.

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:August 12,2019
  • Revised:
  • Adopted:
  • Online: June 28,2023
  • Published:
Mobile website
WeChat