欢迎访问《中外公路》官方网站,今天是
分享到:
G318线色季拉山隧道总体设计方案探讨
DOI:
CSTR:
作者:
作者单位:

四川省公路规划勘察设计研究院有限公司

作者简介:

通讯作者:

中图分类号:

U45

基金项目:

四川省交通运输科技计划项目资助(2024-A-01)


Discussion on the Overall Design Scheme of the Sejila Mountain Tunnel on G318 Line
Author:
Affiliation:

Sichuan Highway Planning,Survey,Design and Research Institute Ltd

Fund Project:

supported by Sichuan Provincial Transportation Technology Project(2024-A-01)

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    G318线色季拉山隧道是国内少有的近期山区国道与远期高速公路共用路段的隧道工程,具有高海拔、特长、近远期结合设计难度大等特点。本文对该隧道的总体设计、平导利用设计、近远期结合的通风排烟方案、防灾疏散与救援等关键技术进行研究,得出以下主要结论:1)充分结合近远期需求开展设计,采用近期国道单洞对向交通隧道与远期高速公路双洞单向交通隧道共线的方案具备较大优势;2)近远期平导的功能定位与利用设计尤为关键,创新提出近期为主洞+贯通平导布置,远期利用主洞作为高速右线隧道+扩挖平导为高速左线隧道的总体建设方案;3)综合排烟控制难易性、交通量、经济性等因素,推荐近期采用主洞全纵向射流通风+竖井排烟,远期增设1座竖井形成两区段送排式通风排烟的总体通风方案;4)提出火灾工况下合理可行的行车救援、通风排烟组织方案,采用Pathfinder仿真模拟得到近期、远期火灾工况人员疏散逃生最大时间分别为163.5s与217.8s。

    Abstract:

    The Sejilashan Tunnel on the G318 Line has many characteristics, such as super-long length, difficult design combining short-term and long-term. It is a rare tunnel project in China that shares the road section of the recent mountain national highway and the far-term expressway. In this paper, based on the characteristics of the project, the key technical problems of overall design, utilization design of parallel heading, ventilation and smoke discharge scheme of near and long-term combination, disaster prevention, evacuation and rescue are studied. The following main findings are concluded: (1) The construction plan is fully integrated with the overall design of the entire process based on the needs of both the near and long term, and the scheme of using a single-tube cross-traffic tunnel for national highways in the near term and a double-tube one-way traffic tunnel for expressways in the long term has significant advantages. (2) The functional positioning and utilization design of the parallel heading for both short-term and long-term stages are particularly critical, its functionality should be fully leveraged., and overall consideration should be taken to maximize the effectiveness of the parallel heading in both the short and long term. This article innovatively proposes a Overall construction plan for the short term, which is to use the main tunnel plus a through parallel heading, and for the long term, which is to use the main tunnel as the right-hand tunnel of the expressway, while expanding the excavation of the parallel heading as the left-hand tunnel of the expressway. (3)In consideration of the characteristics of the Sejilashan Tunnel with high altitude, ultra-long distance, and a through-type parallel heading, it is recommended to adopt full vertical ventilation for the main tunnel in the near term and vertical smoke exhaust through shafts. In the long term, an additional vertical shaft should be added to form a two-zone exhaust ventilation system with exhaust fans in each section. (4)In the near term, the parallel heading is utilized as an evacuation and rescue channel, following the principles of separating people and smoke, rapid escape and rescue, and easy operation and control of ventilation and smoke exhaust, a reasonable and feasible traffic rescue and ventilation and smoke exhaust organization plan should be proposed under fire conditions, additionally, Pathfinder is employed to determine the personnel evacuation time under such fire scenarios.

    参考文献
    相似文献
    引证文献
引用本文
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2026-04-21
  • 最后修改日期:2026-09-07
  • 录用日期:2026-10-08
  • 在线发布日期:
  • 出版日期:
文章二维码
网站二维码
期刊公众号